Technip Energies awarded pre-EPC contract from Circa Group for Resolute project
Type of post: NEWS IN BRIEF.
Sustainable biochemicals company Circa Group AS has engaged Technip Energies to conduct pre-EPC phase engineering work as the next step in the execution stage of the ReSolute project.
Press release: “Circa commissions Technip Energies for Resolute next stage engineering”, 08/06/2021.
Related posts:
- “ReSolute project - New BBI JU flagship biorefinery will produce green solvent from wood biomass”, 05/10/2020.
- “Circa successfully completes 56 M€ IPO that will be used to build its green solvent biorefinery”, 03/03/2021.
The contract with Technip Energies deliberately overlaps the basic engineering design stage currently managed by Wood Consulting and has the main objectives of:
(i) maintaining the project schedule as the project starts early-stage engineering;
(ii) construction activities on site, specifically those of site preparation, and readiness of buildings. It also allows for a head start of detail engineering and ordering of long lead items (LLIs).